Bach Dang Shipyard lays keel for 14,000 m³ chemical oil tanker
Bach Dang Shipbuilding Limited Company has laid the keel for a 14,000 m³ M75-02 chemical/oil tanker built to international standards.

The keel-laying marks a key milestone as the ship moves into hull assembly.
According to the design, the M75-02 has a cargo capacity of 14,000 m³, a maximum length of 132 m, a beam of 20.4 m and a full-load displacement of about 12,950 tonnes. It will be powered by a Hanshin Diesel main engine rated at 3,309 kW and complies with double-hull tanker standards under KR supervision during construction.
This vessel is a specialized, high-spec ship intended for operation on unrestricted international trade routes. It is being built to the International Association of Classification Societies (IACS) standards, meeting stringent safety, structural and environmental protection requirements.
Hai Phong News